<

back to Awards Guidelines

2026 ACEC-BC Awards for Engineering Excellence

Project Awards Submission

Submission Deadline: Feburary 20, 2026 @ 11:59PM PST  |  Got a question? Contact us!

Information on Judging and Evaluation

Projects are evaluated by a jury consisting of engineering professionals and construction and design partners. The jury includes up to 20 members and collaborates to choose the category award recipients and the annual Lieutenant Governor’s Award winner.

Listed below are the key factors the jury will consider during the evaluation process. While not all elements are mandatory, we encourage participants to present their projects with a balanced approach, highlighting technical details and explaining how their project addressed some of the following aspects. In your submission, consider the overall story including the five W’s (Who, What, Why, When, Where) assisting the jury in evaluating these key factors.

Technical

  • Technical Excellence and Innovation: Quality of engineering and design, including creative and innovative solutions.
  • Challenges Overcome: Solutions to significant obstacles encountered during the project.
  • Future Trends: Forward-thinking approaches that enhance the project.
  • Engagement in Design and Construction: Depth of collaboration with key stakeholders during the project’s design and construction phases.
  • Collaboration: Innovative approaches to working with partners, clients, and communities that contributed to project success.

Environmental

  • Positive Lasting Environmental Impact: The project’s approach to sustainability, resource conservation, and long-term environmental benefits.
  • Climate Change: Efforts to reduce emissions, improve energy efficiency, and adapt to climate-related challenges.

Social

  • Contribution to the Community: Positive social, cultural, and economic impact on the local community.
  • Equity, Diversity, and Inclusion: Demonstration of practices that promote equity, diversity, and inclusion principles.
  • Indigenous Relations: Engagement with Indigenous communities, respecting Indigenous knowledge, and promoting reconciliation.

▼ View what's included in each part of the submission by simply clicking on each section ▼

Award Guidelines
Part 1: Contact Information
Part 2: General Project Info
Part 3: Project Submission
Part 4: Additional Information
Eligibility
  • All ACEC-BC members (in good standing) are encouraged and eligible for entry into the awards competition.
  • Joint submissions involving non-ACEC-BC members are acceptable only if an ACEC-BC member performed more than 50% of the engineering work (for the submitted component).
  • Members may submit a maximum of two entries in any one category, and a maximum of one entry in each of the other categories.
Project Specific Rules
  • Date: Projects where the design and construction elements were completed between January 2025 – January 2026 are eligible.
  • Location: Only projects managed and largely engineered in a BC office are eligible.
  • Client Approval: Client confirmation of dates and approval to submit will be required during submission.
  • Category Selection: If the judges determine that the entry is better suited to a different category, they may reassign it at their discretion.
  • Entry Fee: $1350+ GST per project entry. To support members to celebrate with their clients, each entry includes 4 tickets to the Gala.
**NEW FOR 2026** The Projects Under $2.5M category has been updated and renamed to the Small Firm Projects category. The Small Firms Projects category celebrates outstanding engineering projects delivered by Small Firms. These are privately owned companies with fewer than 100 employees, as defined by the ACEC-BC Small Firms Council. See full details here.

Submission Contact Information

Marketing Contact Information

We will contact this individual for the Awards digital promotions and advertising.

Please note that the Projects Under $2.5 Million category has been updated and renamed to the Small Firm Projects category.

Eligibility Criteria:
  • The submitted project scope must be led and substantially performed by the Small Firm
  • The submitting firm must be:
    • An ACEC-BC member
    • Privately owned
    • Employing fewer than 100 people (based on ACEC-BC N-number)
  • Joint submissions are eligible if the Small Firm is the lead or primary consultant
  • There is no construction cost limit
  • At the entrant’s discretion, a project may be entered in this category or any other category

As you would like it displayed publicly

Please include this a list limited to 3-4 words per line

Project Description

The below content will be shared with the judges AND displayed publicly on acecbcawards.ca.

This is what the Gala host will read out when announcing the nominees.

This is what the Gala host will read out if your project is a winner.

File types allowed: jpg, jpeg, png

Please include a one page letter from the owner of the project giving permission to enter the project into the competition and certifying that the design and construction (or the assignment) was largely completed between January 2025-2026. See link to template below!

Link: Client/owner permission letter template
Simply share the template with the project owner and ask they insert it into their letterhead and sign!

If you were not the prime, please include a one page letter from the prime or main consultant on the project giving permission to enter the project into the competition and verifying the role played by the submitting firm (not required if either the owner or the submitting firm is the prime/main consultant).

Part 4: Additional Information

Additional Information (optional)

In addition to content included in Part 3, you may also include a PDF summary package with additional detail. This is limited to a total of 5 pages:

Pages 1-4:
  • Additional info / Summary: this may highlight: project objectives, solutions, achievements, technical excellence, innovation, and important aspects of the project for example sustainability, equity, aesthetics, economic, etc.
  • Page size 8.5x11, minimum font size 12
  • This document may include graphics (photos, tables, etc.) that illustrate the important aspects of the project
Page 5:
  • One drawing easily viewed on a monitor (something that would be legible if printed on 11 x 17 paper).

PDF format only